Orwell Logistics Park, Felixstowe
Manton Lane, Bedford, Bedfordshire
Link was asked by Equation Properties to closely support their assessment and due diligence of the site prior to acquisition. The proposed development included over 1Msqft B8 logistics space, to be delivered over multiple phases.
We were delighted to be commissioned to provide highway engineering and primary infrastructure services to support the construction of the S278 access improvements off the A14 with Highways England and onsite roundabout.
The agreed scope of work for Link included:
- Site appraisal to identify risk and cost elements with regards to access, S278 works and highways;
- Detailed highways design for the junction improvements off the A14, based on CD123 of the DMRB to comply with the requirements of Highways England;
- Detailed design of the site roundabout in compliance with CD116 of the DMRB;
- Detailed liaison with client, design team and tendering contractors;
- Construction support and value engineering options.