Land North of Beaconside
Beaconside, Stafford
The proposed development in this project was part of the allocated housing provision for Stafford. The site extended to 175 hectares and the £400 million development was to include up to 2,000 dwellings, local centres, 2 schools with supporting green infrastructure, highways and associated works.
Link Engineering was appointed by Maximus to produce a Flood Risk and Drainage Technical Note to outline and support the proposals at the Planning Committee and to address concerns raised by local residents.
Team Member Contact
Nick Moore
Managing Director
MEng (Hons) CEng MICE