innova business park
Enfield, London
Link was originally approached by Goodman to review the existing condition of the external yard at their site in Enfield, London. We provided option improvement schemes covering short, medium and long term solutions. Goodman decided to proceed with a long term solution; to remove and replace the entire existing external yard area, which had a number of existing faults.
Goodman subsequently appointed Link to design the package to facilitate the tender and construction of the project works. Following completion of the tender, Magrock was appointed as contractor on a traditional contract basis to undertake the works and Link provided support during construction phase.
The challenges in this project included: a retrofit of an existing service area, coordination with existing underground drainage and utilities and investigative elements to analyse existing faults and recommend solutions.
Services included:
- Full 2D and 3D design and setting out
- Pavement design to allow the use of recycled materials
- Pavement and kerbing constructions
- Design of substation foundations and coordination of utilities
- Retrofit and enhancement to existing drainage
- Support during construction phases
Link worked in close collaboration with the development team to ensure successful completion of the works in time for planned building occupation.