The proposed development in this project was part of the allocated housing provision for Stafford. The site extended to 175 hectares and the £400 million development was to include up to 2,000 dwellings, local centres, 2 schools with supporting green infrastructure, highways and associated works.

Link Engineering was appointed by Maximus to produce a Flood Risk and Drainage Technical Note to outline and support the proposals at the Planning Committee and to address concerns raised by local residents.