Stallings Lane, Kingswinford S278

Stallings Lane, Kingswinford, Dudley, West Midlands

Client:Keepmoat Homes Sector:Development Infrastructure, Residential Services:Civil Engineering Link Design Lead:Robert Gill

Link were appointed by Keepmoat Homes to prepare and obtain S278 Technical Approval for a 40m ICD roundabout as the primary access off Stallings Lane for the mixed use Residential (Keepmoat) and Commercial (Helical PLC) in Kingswinford.

The proposed detailed design was to be in accordance with Design Manual for Roads and Bridges and Dudley Metropolitan Borough Council design standards in line with the consented planning applications details, including:

  • Full 2D and 3D design and setting out
  • Pavement and Kerbing constructions
  • Road markings and signage to TSRG
  • Street Lighting
  • Stage 1/2 Road Safety Audit responses

Link were commissioned to continue to support this development through to construction and provide technical advice in relation to contractor queries associated with the approved design. 

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE