Link was appointed by Cardiff BMX Racing Club to undertake the design of the flood risk and drainage elements of the development of a BMX track and associated facilities.
Link’s team prepared a package of work in support of a SuDS Approval Body application, which included:
- On-site drainage strategy drawings;
- 3D design of attenuation ponds and conveyance swales, to discharge surface runoff into the wetlands to the south at a suitable location. Completed in co-ordination with relevant design team parties;
- Long and cross sections of the proposed ponds, swales and outfall arrangements;
- SAB Application Documents.
The site had a tight boundary defined by existing fencing and high levels of groundwater and surface water flooding had been experienced in the area. In spite of these constraints, Link designed a robust drainage strategy both on-site and beyond the boundary to the point of outfall.


Team Member Contact


Ferdi Jafar
Associate
BEng (Hons)
Team Member Contact


James Hall
Assistant Engineer
MEng (Hons)
Team Member Contact


Valentin Ivanov
Associate
MEng (Hons) CEng MICE