Lidl, Tame Bridge
Walsall Road
Link was appointed by Lidl for the development of a new Lidl food store with associated car parking area along Walsall Road (A4031). Link was tasked with designing the on-site levels & drainage and S278 design works.
The design of the drainage and levels had to carefully consider the existing site constraints as the development was a brownfield site. The drainage strategy utilised infiltration. However, careful consideration was required due to groundwater table. The level strategy had to consider existing levels in number of locations along the site due to the minimal space for provision of retaining whilst aiming to achieve an earthworks cut & fill balance.
The Section 278 design was interesting as it had a variety of items that put our highway team to the test. From Signal Crossing, opening of a central reserve to allow right in and right-out movements and narrowing & widening of carriageway.
Do you have any highway schemes that require assistance? Please get in touch to discuss how Link can assist you.
The scope of works included:
- Proposed Foul and Surface Water Drainage Strategy
- Addressing LLFA comments
- Section 278 Application Support.
- Proposed External Levels Strategy
- Coordination with client/design team;
Team Member Contact
Ferdi Jafar
Associate
BEng (Hons)
Lidl Kettering Road
Kettering road, Northampton
Link was appointed by Lidl for their new retail food store along Kettering Road, Northampton, with an associated car parking area. Link was tasked with designing, managing, and securing Section 278 approval for the highway access works, including a ghost right turn and road widening.
This project marks a significant milestone for Link Engineering, as it achieved the fastest technical approval in its history.
The swift timeline was achieved through best-in-class collaboration between both the client, Lidl, and the Local Highway Authority, West Northamptonshire Council, alongside Link’s detailed expertise in the Section 278 process.
Do you have any highway schemes that require assistance? Please get in touch to discuss how Link can assist you.
Team Member Contact
Ferdi Jafar
Associate
BEng (Hons)
Cardiff BMX Racing Club
Llanrumney, Cardiff
Link was appointed by Cardiff BMX Racing Club to undertake the design of the flood risk and drainage elements of the development of a BMX track and associated facilities.
Link’s team prepared a package of work in support of a SuDS Approval Body application, which included:
- On-site drainage strategy drawings;
- 3D design of attenuation ponds and conveyance swales, to discharge surface runoff into the wetlands to the south at a suitable location. Completed in co-ordination with relevant design team parties;
- Long and cross sections of the proposed ponds, swales and outfall arrangements;
- SAB Application Documents.
The site had a tight boundary defined by existing fencing and high levels of groundwater and surface water flooding had been experienced in the area. In spite of these constraints, Link designed a robust drainage strategy both on-site and beyond the boundary to the point of outfall.
Team Member Contact
Ferdi Jafar
Associate
BEng (Hons)
Team Member Contact
James Hall
Graduate Engineer
MEng (Hons)
Team Member Contact
Valentin Ivanov
Associate
MEng (Hons) CEng MICE
Three Lions Yard at St George’s Park
Needwood, Burton on Trent.
The FA commissioned Link Engineering to offer structural and civil engineering services for the construction of Three Lions Yard at St George’s Park in Needwood, Burton on Trent. The project involved building a new storage facility and the infrastructure for access, parking, and the service yard. Link’s role stared from the very initial scoping stage of the project through to the planning application and on site delivery.
The proposed site was located on the former ground staff depot which was fully replaced by the new facility. The ground staff needs were integrated into the new scheme along with FA required uses including analytical room and equipment storage.
The surface water drainage system was designed utilising SuDS with a restricted connection to the existing site outfall. Foundations were traditional pads founded on near surface competent materials.
Following the tender process, TanRo were appointed on a Design and Build contract and Link was novated to them. As part of the contract phase of the scheme Link provided full civil and structural engineering services supporting TanRo with the successful completion and handover of the project to the FA.
The scope of works included:
Civil Engineering Design:
- Private drainage design to building regulations, including attenuation
- Specification of a suitable flow control device;
- Production of Drainage and Highway planning support;
- External construction design. Including construction make-ups, kerbing and construction details in accordance with the consented Materials Plan;
- Earthworks design and specification.
Structural Engineering:
- Provide structural scheme design information for the superstructure and substructure elements to inform the tender process.
- Provide performance specification for the design of subcontractor design items such as first floor offices, staircases etc.
- Liaison with TanRo to discuss and comment on their construction proposals.
Review of subcontractor design information. - Design of all substructure elements (excluding warehouse slab).
- Provide specifications, designers risk assessments and calculations for submission to Building Control.
Team Member Contact
Ferdi Jafar
Associate
BEng (Hons)
Team Member Contact
Fez Osman
Senior Structural Engineer
BEng (Hons) MSc Civil Engineering