Chatterley Valley

Chatterley Valley Development Site, Stoke-on-Trent

Client:John F Hunt Regeneration Ltd / Harworth Estates Sector:Development Infrastructure Services:Civil Engineering, Geotechnical Engineering Link Design Lead:Neil Shuttleworth

Link were appointed by John F Hunt Regeneration Ltd (JFHR) to undertake the infrastructure design for Harworth’s development site in Stoke. The project scope was to construct the site infrastructure and create a number of development plateau’s in preparation for the future vertical build.

This site has a highly variable topography (falling over 50m along its length) and a number of constraints including shallow mine workings and mineshafts, significant depths of made ground, a public right of way and the West Coast Mainline bordering the site boundary.

Our design included:

  • Full 3D modelling of the earthworks (>700,000m3 of cut and fill);
  • Geotechnical design and validation including ground treatment by surcharge and monitoring;
  • On-site highway and street lighting to adoptable standards (via a Section 7 agreement with Staffordshire County Council)
  • Surface water and foul water drainage systems including two large attenuation ponds.
  • Liaison with Network Rail (NR) for any necessary precautions, approvals, or modifications in proximity to the railway infrastructure.
  • Review of historic coal mining reports and records and design of treatment for shallow workings and a number of mineshaft caps across the site.

Link undertook a number of value engineering exercises to optimise the drainage design and simplify the ground treatment approach, whilst ensuring the end product would satisfy the client performance specification.

Team Member Contact

Gavin Sealey

Associate

BSc (Hons) MSc CEng MICE FGS

Team Member Contact

Neil Shuttleworth

Director

MEng (Hons) CEng MICE

Team Member Contact

Tom Andrews

Senior Engineer

MSc Civil Engineering

Team Member Contact

Karishma Lally

Senior Civil Engineer

MEng (Hons) CEng MICE

Hortonwood 45

Telford, West Midlands

Client:Redsun Projects Limited Sector:Logistics Services:Civil Engineering, Structural Engineering Link Design Lead:Chris Hadjivassilou

Link was appointed by Redsun Projects Limited to prepare a detailed Civil and Structural design for a logistics development comprising of 4 units with ancillary offices, external yards and car parks with a total area of approximately 332,500sqft., and to provide and agree a detailed highways design for the proposed access off Hortonwood 45, Telford. The proposed detailed design was to be in accordance with TR66, TR34, National House Building Council, and Telford & Wrekin Council Highways Design Guide including:

  • Planning Support;
  • Production of Flood Risk Assessment;
  • Detailed Civil and Structural Engineering design to support construction;
  • Foundation design;
  • Pavement, kerbing and external works construction make-up;
  • Post novation services within a D&B contract.

Link was commissioned to continue to support this development during construction through a novation agreement with the successful Design and Build contractor.

Team Member Contact

Chris Hadjivassiliou

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Team Member Contact

Valentin Ivanov

Associate

MEng (Hons) CEng MICE

Team Member Contact

Tom Andrews

Senior Engineer

MSc Civil Engineering

Team Member Contact

Fez Osman

Senior Structural Engineer

BEng (Hons) MSc Civil Engineering