Flowserve

Hawton Lane, New Balderton, Newark

Client:Lovell Homes Sector:Residential Services:Civil Engineering, Planning Support Link Design Lead:Robert Gill

Link was appointed by Lovell Homes to undertake the design of the highway and drainage elements of a residential development in Newark, comprising of 309 new homes.

Link completed the production of a package of work to supplement the reserved matters application, which included:

  • Horizontal Geometry Assessment and masterplanning support and input
  • Swept Path Analysis
  • Proposed Levels Design
  • Proposed Drainage Design
  • Cut and Fill/Earthworks Design

This site was very complex with regards to the earthworks strategy due to the existing land use leaving foundry sands on site, the shape of the site and the site being very flat. Considering all of these factors, Link devised a detailed earthworks strategy, outlining the movements of the different materials on site. There was particular attention paid to the re-use of materials to minimise the material removed from site.

Image 1 – Link Engineering volumetric assessment of various site arisings
Image 2 – Illustrative Masterplan (Credits: Lovell Homes)

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Team Member Contact

Ben Latcham

Senior Engineer

MEng (Hons)

Team Member Contact

Fez Osman

Senior Structural Engineer

BEng (Hons) MSc Civil Engineering

Team Member Contact

Tom Price

Associate

BSc (hons)

vale road

Stourport-on-Severn

Client:Tricas Construction Limited Sector:Residential Services:Civil Engineering, Planning Support, Structural Engineering Link Design Lead:Robert Gill

Link was appointed by Tricas Construction to assist their proposed development of 33No. residential dwellings on a brownfield parcel of land previously occupied by Chichester Caravans on Vale Road, Stourport. Link’s brief included supporting their planning application and detailed design phases of works, with residential properties across 3no blocks with 3 – 4 Storeys.  This included detailed design and Technical Approval of the access works under a S278 Agreement with Worcestershire County Council.

Our team worked with Tricas from RIBA Stage 2 (Concept) right through to RIBA Stages 5 & 6 (Construction and Handover) for Civil and Structural design elements.

The proposed detailed design, post planning included:

  • Full 2D and 3D design and setting out in support of a site wide volumetric exercise;
  • Foundation design based on Vibro Stone column ground improvement (with performance specification provided by Link);
  • Bespoke masonry superstructural design;
  • Precast concrete floors;
  • S278 detailed design and approval with WCC Highways;
  • Onsite private external levels and pavement constructions;
  • Foul and Surface water drainage design including SUDS features;

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Team Member Contact

Fez Osman

Senior Structural Engineer

BEng (Hons) MSc Civil Engineering

Park Lane

Cradley, Halesowen

Client:Countryside Partnerships Sector:Development Infrastructure, Residential Services:Civil Engineering Link Design Lead:Robert Gill

Park Lane, Cradley is a proposed residential development for circa 89 dwellings commissioned by Countryside Developments. Link provided an initial value engineering design identifying design risks and opportunities for future consideration. Onsite works involved the Section 38 and Section 104 design packages in addition to private drainage design and external levels. Additionally Link prepared the offsite civil engineering works associated with the site S278 which includes the provisions of a Ghost Right Access and various pedestrian crossings of Park Lane.

The steep nature of the site introduced an additional complexity, especially when it came to value engineering. Retaining wall heights were reduced whilst ensuring appropriate gradients for the residential roads in accordance with Dudley standards, as well as DDA compliant driveways. Furthermore the drainage being so steep meant a series of hydrobrakes were introduced throughout the system via a cascade to control the flow and reduce the volume of attenuation at the downstream end of the site.

Team Member Contact

Karishma Lally

Senior Civil Engineer

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Overstone green

A43, Overstone Green, Northampton

Client:L&Q Estates Sector:Development Infrastructure, Residential Services:Civil Engineering Link Design Lead:Robert Gill

Link was instructed on the development of a new 86 hectare residential development of circa 1600 dwellings. Building on our relationship with L&Q Estates who are working in partnership with Davidson Homes, onsite works involved the Section 38 residential spine roads, Section 104 drainage design and full technical approval packages. This residential infrastructure also consists of strategic footway and cycleway links which connect with all residential parcels, as well as amenity features such as ponds, swales and Local Equipped Areas for Play.

Link was also commissioned to undertake the Section 278 works which comprised a 4-arm 70m ICD roundabout, tying back into the existing A43 carriageway. In due course, the A43 single carriageway will become a dual carriageway, so we were also commissioned to design a footway/cycleway that met the same line and level for the future dual carriageway but for the current single carriageway works. This involved a complex design to ensure the levels would work with both the single and dual carriageway scenario.

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE

Team Member Contact

Valentin Ivanov

Associate

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Team Member Contact

Karishma Lally

Senior Civil Engineer

MEng (Hons) CEng MICE

Hall Green Road, West Bromwich

Hall Green Road, West Bromwich, West Midlands

Client:Countryside Partnerships Sector:Residential Services:Civil Engineering Link Design Lead:Robert Gill

Link was appointed by Countryside Properties to provide civil engineering services for their proposed development of Hall Green Road, West Bromwich. The scope of services was to cover planning through to detailed design for a proposed residential development of 223 dwellings. Link were engaged to provide planning input in relation to drainage and highways in order to provide sufficient information to satisfy the local planning authority in order to facilitate the granting of planning permission for the site. 

Link’s role post achievement of planning permission was agreed to include producing the detailed design packages to enable S104 and S278/38 packages to be submitted to Severn Trent Water and Sandwell Metropolitan Borough Council Highways respectively. Taking these applications through to technical approval to facilitate the future adoption of the drainage and highway infrastructure. In addition to this, Link’s were asked to provide the private levels and drainage designs for the plots themselves.

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Land North of Beaconside

Beaconside, Stafford

Client:Maximus Strategic LLP Sector:Development Infrastructure, Residential Services:Civil Engineering, Planning Support Link Design Lead:Nick Moore

The proposed development in this project was part of the allocated housing provision for Stafford. The site extended to 175 hectares and the £400 million development was to include up to 2,000 dwellings, local centres, 2 schools with supporting green infrastructure, highways and associated works.

Link Engineering was appointed by Maximus to produce a Flood Risk and Drainage Technical Note to outline and support the proposals at the Planning Committee and to address concerns raised by local residents.

Team Member Contact

Nick Moore

Managing Director

MEng (Hons) CEng MICE

Ingelwhite Road S278

Ingelwhite Road, Longridge, Lancashire

Client:Barratt & David Wilson Homes Sector:Residential Services:Civil Engineering Link Design Lead:Chris Hadjivassiliou

The scheme included a residential development of 8.04 hectares of land for up to 190 dwellings, with new highway access from Inglewhite Road, public open space and associated infrastructure.

Link were appointed by Barratt & David Wilson homes to design and obtain technical approval for the access arrangements and offsite highway improvements.

Link’s involvement included engaging and meeting with Lancashire Highways to review site constraints and agree layout variations. Our team completed detailed design including pavement construction, geometry and street lighting to support a S278 agreement. Works also included footway widening along development frontage and enhanced cycleway links into the development.

Team Member Contact

Chris Hadjivassiliou

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Milton Keynes, Western Expansion Area 10

Milton Keynes

Client:L&Q Estates, Redlawn Land Limited Sector:Development Infrastructure, Residential Services:Civil Engineering Link Design Lead:Nick Moore

Building on established relationships, Link were appointed to assist Redlawn Land Limited (a joint venture between Milton Keynes Council and L&Q Estates) to design the strategic infrastructure to support the delivery of the Western Expansion Area in Milton Keynes.

The work included the design of roads and drainage infrastructure in the Area 10 South part of the development to support the delivery of 1,500 homes, a primary school and community facilities.

Due to the historic nature of the site, in order to successfully deliver the project our team at Link assimilated and processed a vast amount of data in a short space of time.

Link worked proactively with the client team with a regular dialogue via technical workshops and interaction with Milton Keynes Council and the water authority, Anglian Water Services. This engagement led to the generation of several significant value engineering options including reduction in roundabout sizing and rationalising drainage proposals.

Key constraints in the project were tie-ins to existing infrastructure, ecological management plans and underground services including BPA fuel lines and water mains.

As our largest individual project to date, the whole team were involved in various aspects, working together to ensure delivery to deadline.

Services included:

  • Section 38 and 278 highway design
  • Section 98 and 104 drainage design
  • Earthworks
  • Service coordination and protection plans
  • Signage, Pavements, Kerbing
  • Structural AIPs 
  • Legal plans
  • Land drainage
  • Design decision log
  • Designers risk assessments

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Stallings Lane, Kingswinford S278

Stallings Lane, Kingswinford, Dudley, West Midlands

Client:Keepmoat Homes Sector:Development Infrastructure, Residential Services:Civil Engineering Link Design Lead:Robert Gill

Link were appointed by Keepmoat Homes to prepare and obtain S278 Technical Approval for a 40m ICD roundabout as the primary access off Stallings Lane for the mixed use Residential (Keepmoat) and Commercial (Helical PLC) in Kingswinford.

The proposed detailed design was to be in accordance with Design Manual for Roads and Bridges and Dudley Metropolitan Borough Council design standards in line with the consented planning applications details, including:

  • Full 2D and 3D design and setting out
  • Pavement and Kerbing constructions
  • Road markings and signage to TSRG
  • Street Lighting
  • Stage 1/2 Road Safety Audit responses

Link were commissioned to continue to support this development through to construction and provide technical advice in relation to contractor queries associated with the approved design. 

Team Member Contact

Robert Gill

Director

MEng (Hons) CEng MICE

Team Member Contact

Jason Gibbons

Senior Design Technician

EngTECH MICE

Team Member Contact

Tom Price

Associate

BSc (hons)