Barking 278, barking
Alfred’s Way, Barking
Link were appointed by Bridge Industrial to lead discussions with TfL and obtain S278 Technical Approval for the required improvements to an existing access onto the A13 Alfred’s Way, Barking.
The proposed detailed design was to be in accordance with Design Manual for Roads and Bridges and Transport for London design standards in line with the consented planning applications details, including:
- Full 2D and 3D design and setting out
- Pavement and Kerbing construction
- Road markings and signage to TSRG
- Stage 1/2 Road Safety Audit responses
The scope included detailed discussions with TfL and RMS to agree the final arrangement and construction requirements while considering site constraints, timescale risks and costs for our client. Ultimately, our input included detailed negotiations to support commuted sums calculations and the final S278 agreement between our client and TfL.
Bridge Industrial broke ground in September 2022 and has some interesting features being a Net Zero Carbon Development. You can read more about it below.
Team Member Contact
Chris Hadjivassiliou
Director
MEng (Hons) CEng MICE
Team Member Contact
Valentin Ivanov
Associate
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
vale road
Stourport-on-Severn
Link was appointed by Tricas Construction to assist their proposed development of 33No. residential dwellings on a brownfield parcel of land previously occupied by Chichester Caravans on Vale Road, Stourport. Link’s brief included supporting their planning application and detailed design phases of works, with residential properties across 3no blocks with 3 – 4 Storeys. This included detailed design and Technical Approval of the access works under a S278 Agreement with Worcestershire County Council.
Our team worked with Tricas from RIBA Stage 2 (Concept) right through to RIBA Stages 5 & 6 (Construction and Handover) for Civil and Structural design elements.
The proposed detailed design, post planning included:
- Full 2D and 3D design and setting out in support of a site wide volumetric exercise;
- Foundation design based on Vibro Stone column ground improvement (with performance specification provided by Link);
- Bespoke masonry superstructural design;
- Precast concrete floors;
- S278 detailed design and approval with WCC Highways;
- Onsite private external levels and pavement constructions;
- Foul and Surface water drainage design including SUDS features;
Team Member Contact
Robert Gill
Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Team Member Contact
Fez Osman
Senior Structural Engineer
BEng (Hons) MSc Civil Engineering
Park Lane
Cradley, Halesowen
Park Lane, Cradley is a proposed residential development for circa 89 dwellings commissioned by Countryside Developments. Link provided an initial value engineering design identifying design risks and opportunities for future consideration. Onsite works involved the Section 38 and Section 104 design packages in addition to private drainage design and external levels. Additionally Link prepared the offsite civil engineering works associated with the site S278 which includes the provisions of a Ghost Right Access and various pedestrian crossings of Park Lane.
The steep nature of the site introduced an additional complexity, especially when it came to value engineering. Retaining wall heights were reduced whilst ensuring appropriate gradients for the residential roads in accordance with Dudley standards, as well as DDA compliant driveways. Furthermore the drainage being so steep meant a series of hydrobrakes were introduced throughout the system via a cascade to control the flow and reduce the volume of attenuation at the downstream end of the site.
Team Member Contact
Karishma Lally
Senior Civil Engineer
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Hortonwood 45
Telford, West Midlands
Link was appointed by Redsun Projects Limited to prepare a detailed Civil and Structural design for a logistics development comprising of 4 units with ancillary offices, external yards and car parks with a total area of approximately 332,500sqft., and to provide and agree a detailed highways design for the proposed access off Hortonwood 45, Telford. The proposed detailed design was to be in accordance with TR66, TR34, National House Building Council, and Telford & Wrekin Council Highways Design Guide including:
- Planning Support;
- Production of Flood Risk Assessment;
- Detailed Civil and Structural Engineering design to support construction;
- Foundation design;
- Pavement, kerbing and external works construction make-up;
- Post novation services within a D&B contract.
Link was commissioned to continue to support this development during construction through a novation agreement with the successful Design and Build contractor.
Team Member Contact
Chris Hadjivassiliou
Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Team Member Contact
Valentin Ivanov
Associate
MEng (Hons) CEng MICE
Team Member Contact
Tom Andrews
Senior Engineer
MSc Civil Engineering
Team Member Contact
Fez Osman
Senior Structural Engineer
BEng (Hons) MSc Civil Engineering
HYNDBURN ROAD
Hyndburn Road, Accrington, Lancashire
Link Engineering was delighted to support its client, Barnfield Construction in agreeing the new access arrangement with Lancashire County Council from our Manchester office.
The proposed development consisted of a new food store on Hyndburn Road, Accrington, with the new access provided through the provision of a new ghost right turn into the site with pedestrian/cyclist improvements along the western boundary.
Once planning consent had been granted, Link completed the detailed highway design associated with the proposed access and other highway improvements required as part of the planning permission. We played a key role in engaging with Lancashire County Council Highways to agree the design principles, value engineering solutions and complete the detailed design to support a S278 Agreement.
The scope of works included:
- Full 2D and 3D design and setting out;
- Pavement and Kerbing construction layouts & details;
- Horizontal visibility profiles;
- Swept Path Analysis;
- Cyclist and pedestrian infrastructure improvements;
- Road markings and signage to TSRGD;
- Street Lighting;
- Road Safety Audit responses;
- Discharge of pre-commencement planning conditions;
- Underground utilities coordination.
Team Member Contact
Chris Hadjivassiliou
Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Verda Park, Wallingford
Wallingford, South Oxfordshire
Verda Park is a net zero carbon commercial development in Wallingford, South Oxfordshire. Link was delighted to work on this project which has outstanding sustainability features. We initially supported the client team in providing due diligence support pre-purchase. Post-purchase, we supported the project through planning, providing transportation advice.
Once planning consent had been granted, we completed the detailed highway design associated with the proposed access and planning obligations for highway improvements. We played a key role in engaging with Oxfordshire County Council to agree the design principles and complete the detailed design to support a S278 Agreement.
Team Member Contact
Nick Moore
Managing Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Weldon Park Academy
Oundle Road, Corby, North Northamptonshire
BAM Construction appointed Link to support the associated offsite S278 works relating to the construction of the Weldon Park Academy, Corby. Offsite works were to involve the full detailed design and technical approval with Northamptonshire Highways of the following packages of works:
- S184 Temporary construction access
- Primary access works off Oundle Road (A427) at the junction with Bear Lane in the form of a 4-Arm 40m ICD roundabout,
- Widening of Oundle Road (7.3m) west towards the Persimmon Homes & Mulberry scheme S278 access works to include various traffic calming measures, street lighting and share foot/cycleway.
- Alteration of the existing speed limits from derestricted (60mph) to 30mph with the above intended to support driver habit.
Link was engaged to work across all areas of offsite modifications including Civil 3D, pavement, drainage, signage and street lighting designs. An assessment of existing utility apparatus potentially affected by the works was also requested by the client, with all works required to be submitted to Northamptonshire Highways for Technical Approval. A Stage 2 Road Safety Audit was also to be completed to support Technical Approval with Link providing a designers response.
Team Member Contact
Robert Gill
Director
MEng (Hons) CEng MICE
Team Member Contact
Valentin Ivanov
Associate
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Hall Green Road, West Bromwich
Hall Green Road, West Bromwich, West Midlands
Link was appointed by Countryside Properties to provide civil engineering services for their proposed development of Hall Green Road, West Bromwich. The scope of services was to cover planning through to detailed design for a proposed residential development of 223 dwellings. Link were engaged to provide planning input in relation to drainage and highways in order to provide sufficient information to satisfy the local planning authority in order to facilitate the granting of planning permission for the site.
Link’s role post achievement of planning permission was agreed to include producing the detailed design packages to enable S104 and S278/38 packages to be submitted to Severn Trent Water and Sandwell Metropolitan Borough Council Highways respectively. Taking these applications through to technical approval to facilitate the future adoption of the drainage and highway infrastructure. In addition to this, Link’s were asked to provide the private levels and drainage designs for the plots themselves.
Team Member Contact
Robert Gill
Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Derby Cathedral School
Great Northern Road, Derby, Derbyshire
Link was appointed to support BAM Construction with the associated offsite S278 works relating to the construction of the Derby Cathedral School, Derby. Offsite works were to involve the full detailed design and technical approval with Derby City Council of the following packages of works;
- Site Access works consisting of a new give way priority bellmouth, including alterations to the existing footway and modifications to the existing Traffic Regulation Order.
- Junction improvement to the offsite junction between Great Northern Road and Uttoxeter Old Road to the west of the development area, predominantly in the form of modification to the existing road markings to improve junction visibility.
- Junction alterations to the Great Northern Road and Uttoxeter New Road arrangement to provide improved junction capacity as this is the principal route to the School, as per the General Arrangement extract below.
Works on all three areas of offsite modifications included Civil 3D, pavement, drainage, signage and street lighting designs including an assessment of existing utility apparatus potentially affected by the works, submitted for Technical Approval by Derby City Council. Stage 2 Road Safety Audit was to be completed to support Technical Approval as necessary at the appropriate time.
Team Member Contact
Robert Gill
Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE
Ingelwhite Road S278
Ingelwhite Road, Longridge, Lancashire
The scheme included a residential development of 8.04 hectares of land for up to 190 dwellings, with new highway access from Inglewhite Road, public open space and associated infrastructure.
Link were appointed by Barratt & David Wilson homes to design and obtain technical approval for the access arrangements and offsite highway improvements.
Link’s involvement included engaging and meeting with Lancashire Highways to review site constraints and agree layout variations. Our team completed detailed design including pavement construction, geometry and street lighting to support a S278 agreement. Works also included footway widening along development frontage and enhanced cycleway links into the development.
Team Member Contact
Chris Hadjivassiliou
Director
MEng (Hons) CEng MICE
Team Member Contact
Jason Gibbons
Senior Design Technician
EngTECH MICE